Mothaneb Hospital

SCOPE OF WORK

Brief Description: 15,000m2 Project Area, 100 beds

Scope of Work: covered all MEP plus finishing works.

Electrical: Remove, Supply, Install Medium Voltage -Transformer-Medium Voltage Switchgear- Low Voltage Switchgear & panel -Lighting Fixtures-SWITCHES-Uninterruptable Power Supply (UPS)-Fire Alarm System-Public Address / Background Music System-Clock System- Earthing System-Lightning Protection System Low Voltage Diesel Generator.
Fire Fighting: Supply and Installation of Fire firefighting Sprinkler system including zone control valves, Fire hose cabinet and Fire fighting pumps, etc.
Plumbing: Supply and Installation of Water supply system, sewage system, rain water system, Water Closet, Wash Basin, Shawer, Water Pumps, Draining System, Submersible pumps, etc.
Mechanical: Remove, Supply, Install Air Handling Units – Post Treatment Unit – chiller – extract fan – fan coil units -Medical Gas, Domestic Cold and Hot water systems, Building Management systems, Pumps, Drainage System, Fire protection system, Steam system, Sewage treatment Plant.

PROJECT DETAIL

  • Project Name: Mothaneb Hospital
  • Client: Ministry of Health
  • Period: October 15, 2014 to November 20, 2017
Ministry of Health
Client
Al Alam Building
KAUST Residential Villas
Saudi Technical Limited